TotalEnergies EP Mozambique Area 1 Lda.
TotalEnergies operates Mozambique’s Area 1 block, a strategic asset with ~65 Tscf of recoverable gas feeding multi‑phase LNG developments. The role is embedded in a highly collaborative environment with drilling, engineering, subsurface, and business teams. Exceptional seismic and well data quality, offering a unique opportunity for high‑impact geophysical work. Lead full‑cycle interpretation and integration of geophysical data across Area 1 fields Perform advanced seismic interpretation, well calibration, seismic reservoir characterization, and velocity model building and updates. Contribute to integrated subsurface studies by combining geophysical insights with geological, petrophysical, and reservoir engineering data to enhance static and dynamic models.
Apply Now
Senior Reservoir Geophysicist
Description
Contexte et environnement
Activités
Geophysical Interpretation & Reservoir Integration